LED lighting in swimming pools, water parks and theme parks
Safety and visibility, durability against water, chlorine, salt or temperature changes, and high energy efficiency.
Fire-protection infrastructure design
After identifying the level of risk, we size the fire-protection proportionally.
ISO 19650-3 for BIM: Information management in the operation phase
Improved maintenance and operation, reduced operating costs, extended service life, better risk management...
Final analysis of BIM 2.0 platforms: the last three instances
We conclude the series dedicated to BIM 2.0 methodology in construction and architecture, with three additional platforms.
Transformative adaptive architecture: Oriente Green Campus, Lisbon, Portugal
“By peeling back walls and selectively opening up ceilings, the building became naturally ventilated and filled with light”.
Circular shapes with a timeless touch
Landscape architecture and street furniture combine to evoke feelings of fulfilment, whilst remaining free from artifice.


