An elevated causeway project between Qatar and Bahrain
The elevated road would reduce the journey between the two countries from the current 5 hours by ferry to approximately 30 minutes.
27.03.2026|General News|
The elevated road would reduce the journey between the two countries from the current 5 hours by ferry to approximately 30 minutes.
26.03.2026|General News|
The design seeks its integration into the ecosystem as an artificial reef that promotes the proliferation of biodiversity.
24.03.2026|General News|
The thematic project will occupy approximately 78 hectares and will house, in a search for narrative cohesion, 6 immersive thematic areas.
23.03.2026|Company News|
Fluid shapes and hybrid pieces that function as a bench, shading system, viewing platform and street flowerbed.
23.03.2026|General News|
The location of the water park on the 3rd floor imposes specific conditions for its design and construction.
18.03.2026|Company News|
High-performance machining and technical systems that provide strength, durability and high-quality finishes.
17.03.2026|General News|
The structure produces the optical illusion of a weightless ribbon floating in the air or being capriciously dragged by the wind.
16.03.2026|Company News|
The architecture not only contains the gastronomic activity, but also organises it as if it were a theatrical set.
13.03.2026|General News|
A 70m long comic-book Gulliver, with arms, legs and hair that serve as ramps and slides.
12.03.2026|Company News|
A building that forms part of the landscape and provides pedestrian walkways, recreational areas and viewing points.