Surface tension in water
Forces to consider in the design and construction of swimming pools and water attractions.
Role definition in BIM processes
The roles of design and construction specialists in an architectural project must be clearly defined.
Access control in BMS for leisure and tourism resorts
A system that provides the operator with powerful tools to define safety and operational strategies.
Solar generators in leisure and tourism facilities
From design to construction, we optimise the power supply provided by solar panels.
Solar cooling by heat absorption
The maximum output of a solar cooling system coincides with the maximum demand, as well as running on renewable energy.
BIM implementation worldwide: 6 – Australia
To facilitate the implementation of BIM methodology, an electronic guidance portal has been created in the country.
43rd SETT tradeshow (Tourism Equipment and Techniques Show), France (+VIDEO)
Amusement Logic will be present at an event that, with more than 4 decades of existence, has not ceased to grow in importance and visitors.
Trombe walls in architecture
Low maintenance, improved indoor comfort and energy savings are benefits of the architectural system.
Types of welds
Methods for welding parts together, depending on the purpose of joining.
Structural redundancy in architecture
Or qualitative balance between conservative structural design and reasonable economic cost.
Design with glass as the supporting structure
A material that leaves designers free to create sensations of weightlessness and invisibility.
Extension of Shankus Water Park and Resort, India
Design to complete a leisure and recreational offer that attracts a family audience of all ages, all year round.


